au.\*:("FONG CO")
Results 1 to 8 of 8
Selection :
A MODEL FOR ANALYSIS OF THE MALAYSIAN FAMILY PLANNING PROGRAMMEFONG CO.1982; EUROPEAN JOURNAL OF OPERATIONAL RESEARCH; ISSN 0377-2217; NLD; DA. 1982; VOL. 11; NO 2; PP. 133-144; BIBL. 19 REF.Article
CAPACITY EXPANSION OF TWO RELATED EQUIPMENT WITH CONVERSION POSSIBILITYFONG CO.1979; CAH. CENTRE ET. RECH. OPERAT.; BEL; DA. 1979; VOL. 21; NO 2; PP. 155-166; BIBL. 9 REF.Article
THE MULTIREGION DYNAMIC CAPACITY EXPANSION PROBLEM. IFONG CO; SRINIVASAN V.1981; OPER. RES.; ISSN 0030-364X; USA; DA. 1981; VOL. 29; NO 4; PP. 787-799; BIBL. 19 REF.Article
THE MULTIREGION DYNAMIC CAPACITY EXPANSION PROBLEM. IIFONG CO; SRINIVASAN V.1981; OPER. RES.; ISSN 0030-364X; USA; DA. 1981; VOL. 29; NO 4; PP. 800-816; BIBL. 15 REF.Article
PARAMETRIC STUDIES IN TRANSPORTATION-TYPE PROBLEMS.FONG CO; RAO MR.1975; NAV. RES. LOGIST. QUART.; U.S.A.; DA. 1975; VOL. 22; NO 2; PP. 355-364; BIBL. 16 REF.Article
CAPACITY EXPANSION WITH TWO PRODUCING REGIONS AND CONCAVE COSTS.FONG CO; RAO MR.1975; MANAG. SCI.; U.S.A.; DA. 1975; VOL. 22; NO 3; PP. 331-339; BIBL. 13 REF.Article
DETERMINING ALL NONDEGENERATE SHADOW PRICES FOR THE TRANSPORTATION PROBLEM.FONG CO; SRINIVASAN V.1977; TRANSPORT. SCI.; U.S.A.; DA. 1977; VOL. 11; NO 3; PP. 199-222; BIBL. 9 REF.Article
MULTIPERIOD CAPACITY EXPANSION AND SHIPMENT PLANNING WITH LINEAR COSTS.FONG CO; SRINIVASAN V.1976; NAV. RES. LOGIST. QUART.; U.S.A.; DA. 1976; VOL. 23; NO 1; PP. 37-52; BIBL. 8 REF.Article